Overview
Roles: Admin, Supervisor | Interface: Web, Mobile
Construction Daily Reports (Daily Reports) in CrewCenter provide a digital, standardized way to log and share daily activities on construction projects. This feature replaces manual paper reports, enabling teams to track work hours, weather, incidents and project progress with photo documentation. The Construction Diary is available on both web and mobile platforms, supporting seamless collaboration between jobsite and office.
Key Capabilities of Construction Diary
Data Capture
Collect detailed project data by merging existing timecards and related info - workforce, duration, cost codes, materials, and expenses - with extra inputs. These include photos tied to the project and date, plus manual entries like weather, comments, checklist items, and optional signatures.
Mobile Sign-off
Sign reports on mobile and save as PDF.
PDF Access
Access and share report PDFs from any platform.
Template Sync
Template settings from the web are respected on mobile (e.g., hidden fields remain hidden).
Access Control
Only supervisors (project managers) and admins have access to all Construction Diary.
Key Features and User Roles
| Action | Admin | Supervisor (as a Project Manager)* | Employee |
|---|---|---|---|
| Enable/disable Construction Diary |
Yes | No |
No |
| Create, edit and share reports | Yes | ||
| Manage templates | |||
| Add company logo | |||
| Print or export PDF | |||
| View and add data | |||
| View and edit reports | |||
| Sign and share PDFs | |||
| Respect web template settings |
*Note: Only supervisors assigned to at least one project can view the Construction Diary.
How to Create and Manage Construction Diary Project Reports
Roles: Admin | Interface: Web
Enable Construction Diary
Click the Settings cogwheel in the top right corner.
In the General tab, switch ON the toggle for Construction Diary.
Create a Construction Diary Project Report
Roles: Admin | Interface: Web
Generating a daily project report in CrewCenter helps document all key activities, workforce data and site conditions for each day. This process ensures accurate records and supports compliance, communication and project tracking. Follow these steps to create and manage your Construction Diary report:
- Log in to the web platform and select Construction Diary from the left-hand menu.
- Click Create Report
- Select the project
- Select the date.Note: today is set as a default
- Select Template if desired from the dropdown list or create a report without using a template.
- Add a report title (optional).
- Upload the company logo to be displayed on the report (optional).
- Weather details auto-populate based on project location and date. Weather units (Celsius or Fahrenheit) automatically update according to the chosen language.
- Employee work hours and breaks are retrieved from recorded timecards. This section appears only when hours have been recorded, and it shows only the employees who submitted timecards. If no hours are recorded, the area remains empty.
)
Note: The admin can choose whether to view all employees or only 12 at a time. This can be done by clicking “See all” or “Hide.”
Employee time types, cost codes, comments will be also retrieved automatically from recorded Timecards If no data recorded, the area will be empty.
- Add any additional data (e.g., observations, jobsite details) in Additional Data.
- Add checklists if needed (e.g., safety or material checklists).
Add the signature by adding your name or upload signatures from your computer to include in the report.
All photos from the photo library with matching date & project are loaded automatically
Once all data is entered, the user can save the report as a PDF or save a draft to continue later.
How to save the report in PDF
Users can save the report to PDF by clicking “Save PDF” in the top‑right corner.
The file is saved in the Downloads folder by default.
Users can also save their progress by clicking “Save draft” and return to the report at a later time.
Note: User can create many PDFs, even for the same date.
How to manage PDF files
Roles: Admin, Supervisor | Interface: Web
All files saved in PDF format are displayed in a separate “PDF Reports” tab. They can be saved without any limit, even several per day.
The admin and supervisor can quickly preview any report with a single click and close the view by clicking outside the report.
From this page, admins and supervisors can view, print, download or delete a PDF report. To do this, click the three dots on the right side of the report row and select the desired action.
When the user selects the View option, the PDF opens and a bottom panel appears with additional actions: Share, Download, Print or Close the preview.
There are following options:
Share: The Share option allows the user to share the PDF report via email or available communication apps such as Microsoft Teams or WhatsApp.
Print: The Print option allows the user to print the PDF report.
Download: The Download option saves the PDF report to the user’s local computer.
Close: Close the report view.
How to manage templates
Roles: Admin, Supervisor | Interface: Web
Users can create a one Construction Diary template to reuse it for every new report, ensuring that predefined (static) data is automatically populated.
To create a template:
- Go to the Templates tab in the top navigation bar of the Construction Diary.
- Click Create at the top or in the center of the screen.
- Decide which sections should be visible or hidden. To hide a section, click “Hide.” Available sections include: Weather, Employees, Types of time, Cost codes, Comments, Additional Data, Checklists, Signatures, Photos.
- Optionally add Weather comments, Additional Data, Checklists, and Signatures. These will be automatically included in every report created from the template.
- Click Confirm.
- Enter the template name.
- Optionally add a report name and description.
- Upload a logo from your computer and adjust the PDF accent color, if needed.
- Choose whether the template should be assigned to all projects or to a specific project.
- Click Confirm to save the template.
How to Manage Construction Diary on Mobile
Roles: Admin, Supervisor | Interface: Mobile
Admins and Supervisors have access to the Construction Diary on mobile.
To open the Construction Diary, open the menu in the top‑left corner and select Construction Diary. A list of entries from the last 15 days will be displayed. To view a specific diary entry, select the project at the top and then tap the date you want to open.
Users can sign the Construction Diary and generate it as a PDF for sharing or record‑keeping by following the steps below:
- Open the Construction Diary from the application menu.
- Select the project at the top.
- The most recently created project is selected by default.
- If you have access to multiple projects, choose the appropriate one.
- Choose the date for which you want to create the Construction Diary.
- Review the Additional Data section and go through the checklist to ensure all required information is complete and accurate.
- Save the diary as a draft if you want to continue editing it later (optional).
- Add the required signatures.
- Save the draft again if needed, or select Create PDF to generate the Construction Diary immediately.
- Review the generated PDF. It includes:
- Time and attendance data loaded automatically from the web
- Types of time
- Cost codes
- Comments
- Additional data
- Completed checklist
- All added signatures
- Pictures
- Share the PDF using your preferred communication method and/or close the Construction Diary.
Note: The admin can define who is required to sign the document within the template. To set a standard workflow, fill in the Signatures section of the template and specify the responsible person’s name (e.g., always the Project Manager). The admin can pre-fill the signing names; however, these can be changed or updated later, so users should ensure they do not sign on behalf of someone else. Alternatively, the admin can create a project‑specific template with designated signatories assigned to that particular project.
IMPORTANT: Access for the supervisor will be granted only if he or she is assigned as the project manager.
To authorize access for a designated supervisor, please adhere to the following instructions:
- Navigate to the Projects tab.
- Click the pen icon situated on the right side of the selected project.
- Choose the supervisor from the Project Manager field within the list of workers.